⭐ Core Definition: Southeastern Anatolia Project

The Southeastern Anatolia Project (Turkish: Güneydoğu Anadolu Projesi, GAP) is a multi-sector integrated regional development project based on the concept of sustainable development for the 9 million people (2023) living in the Southeastern Anatolia region of Turkey. According to the Southeastern Anatolia Project Regional Development Administration, the aim of the GAP is to eliminate regional development disparities by raising incomes and living standards and to contribute to the national development targets of social stability and economic growth by enhancing the productive and employment generating capacity of the rural sector.The Southeastern Anatolia Region extending over wide plains in the Euphrates-Tigris Basin encompass the administrative provinces of ( Adıyaman, Batman, Diyarbakır, Gaziantep, Kilis, Siirt, Şanlıurfa, Şırnak and Mardin )which are located in the basins of the Euphrates and Tigris and in Upper Mesopotamia. The surface area of the region bordering with Syria to the south and with Iraq to the southeast is 75,193 square kilometres which corresponds to 9.7% of Turkey's total surface area. Turkey has in total 8.5 million hectares of irrigable land and GAP's share in this total is 20 per cent.The total cost of the project is over 190 billion Turkish lira (TL) (2020 adjusted price).

Current activities under GAP include sectors like agriculture and irrigation, hydroelectric power production, urban and rural infrastructure, forestry, education and health. Water resources development envisaged the construction of 22 dams and 19 power plants.

↓ Menu

>>>PUT SHARE BUTTONS HERE<<<

👉 Southeastern Anatolia Project in the context of Syrian-Turkish relations

Turkey–Syria relations are the relations between the Republic of Türkiye and the Syrian Arab Republic. Turkey shares its longest common border with Syria; various geographic and historical links also tie the two neighbouring countries together.

The traditionally tense relations between Turkey and Syria had been due to disputes including the self annexation of the Hatay Province to Turkey in 1939, water disputes resulting from the Southeastern Anatolia Project, and Syria's support for the Kurdistan Workers' Party (abbreviated as PKK) and the now-dissolved Armenian Secret Army for the Liberation of Armenia (abbreviated as ASALA) which has been recognised as a terrorist organisation by NATO, the EU, and many other countries. Relations improved greatly after October 1998, when PKK leader Abdullah Öcalan was expelled by the Syrian authorities. However, the Syrian civil war once again strained relations between the two countries, leading to the suspension of diplomatic contact. A serious incident occurred with the Syrian downing of a Turkish military training flight in June 2012, resulting in Turkey calling an emergency meeting of NATO.

↓ Explore More Topics
In this Dossier

Southeastern Anatolia Project in the context of Keban Dam

The Keban Dam (Turkish: Keban Barajı) is a hydroelectric dam on the Euphrates, located in the Elazığ Province of Turkey. The dam is the first and uppermost of several large-scale dams to be built on the Euphrates by Turkey. Although the Keban Dam was not originally constructed as a part of the Southeastern Anatolia Project (GAP), it is now a fully integrated component of the project, which aims to stimulate economic development in Southeastern Turkey. Construction of the dam commenced in 1966 and was completed in 1974. Keban Dam Lake (Turkish: Keban Baraj Gölü), the reservoir created by Keban Dam, has a surface area of 675 square kilometres (261 sq mi) and is reputedly the fourth-largest lake in Turkey after Lake Van, Lake Tuz, and the reservoir created by the Atatürk Dam.

↑ Return to Menu

Southeastern Anatolia Project in the context of Ilısu Dam

The Ilısu Dam (Turkish pronunciation: [ɯɫɯˈsu]) is a concrete-face rock-fill dam on the Tigris near the village of Ilısu and along the border of Mardin and Şırnak Provinces in Turkey. It is one of the 22 dams of the Southeastern Anatolia Project and its purpose is hydroelectric power production, flood control and water storage. When operational, the dam will support a 1,200 MW power station and will form a 10.4 billion m reservoir. Construction of the dam began in 2006 and was originally expected to be completed by 2016. As part of the project, the much smaller Cizre Dam is to be constructed downstream for irrigation and power. The dam has drawn international controversy, because it will flood portions of ancient Hasankeyf and necessitate the relocation of people living in the region. Because of this, the dam lost international funding in 2008. Most historical structures in Hasankeyf were moved to the new Hasankeyf prior to the filling of the dam. The dam began to fill its reservoir in late July 2019. Due to rainfall, the dam has achieved water levels up to 100m above the river bed and stored 5 billion cubic meters of water. The water level had reached an elevation of 498.2m on 1 April 2020.

DSI has started testing 2 turbines for energy production after completing the spillway testing. The dam reservoir has attained a water volume of 7.6 billion cubic meters. Water storage crest level was 513m on 19 April 2020. It would need 12m rise to achieve the maximum storage level.