Camorino in the context of "Camoghè"

Play Trivia Questions online!

or

Skip to study material about Camorino in the context of "Camoghè"

Ad spacer

⭐ Core Definition: Camorino

Camorino is a former municipality in the district of Bellinzona in the canton of Ticino in Switzerland.

On 2 April 2017 the former municipalities of Claro, Giubiasco, Gnosca, Gorduno, Gudo, Moleno, Monte Carasso, Pianezzo, Preonzo, Sant'Antonio and Sementina merged into the municipality of Bellinzona.

↓ Menu

>>>PUT SHARE BUTTONS HERE<<<

👉 Camorino in the context of Camoghè

The Camoghè is a mountain of the Lugano Prealps, located east of Camorino in the canton of Ticino. It is the highest mountain that can be seen from Lugano city center.

↓ Explore More Topics
In this Dossier

Camorino in the context of Monte Ceneri

Monte Ceneri is a mountain pass in the canton of Ticino in Switzerland. It connects the Magadino Plain and the Vedeggio Valley across the Lugano Prealps at an elevation of 554 metres (1,818 ft) above sea level. It provides the most direct route between the cities of Bellinzona and Lugano. Despite its name (monte is the Italian word for "mountain"), Monte Ceneri is the lowest point on the crest between Monte Tamaro and the Camoghè.

Two tunnels have been dug under Monte Ceneri, the Monte Ceneri Road Tunnel for the A2 motorway and the Monte Ceneri Rail Tunnel for the Gotthard railway. A new rail tunnel, the Ceneri Base Tunnel, was opened in 2020, and connects Camorino near Bellinzona and Vezia near Lugano.

↑ Return to Menu

Camorino in the context of Ceneri Base Tunnel

The Ceneri Base Tunnel (CBT; Italian: Galleria di base del Monte Ceneri) is a Swiss railway base tunnel in the canton of Ticino. It passes under Monte Ceneri between Camorino in the Magadino Flat and Vezia near Lugano; it bypasses the former high-altitude rail route through the Monte Ceneri Tunnel. It is composed of two single-track tunnels, each 15.4 km (9.6 mi) long. It is part of the New Railway Link through the Alps (NRLA) project for faster north-south rail links across the Swiss Alps.

An exploration tunnel near Sigirino was excavated between 1999 and 2003 to gain geological data on the rock formations at the Ceneri Base Tunnel's level. Based on those data, it was decided to excavate most of the tunnel with traditional blasting methods and only drill a small part using a faster tunnel boring machine (TBM). Both the CBT and Gotthard Base Tunnels were built under contract from the Swiss Federal Government by Alptransit Gotthard AG. Construction of the two single-track bores started during March 2006. The official start of the CBT's construction phase was celebrated on 2 June 2006 with the laying of a foundation stone. The final breakthroughs took place on 21 January 2016 (west tube) and 26 January 2016 (east tube). Rail service started on 4 September 2020 and was operationalised for freight in December 2020.

↑ Return to Menu