Linden, New Jersey in the context of "Brooklyn–Queens Expressway"

Play Trivia Questions online!

or

Skip to study material about Linden, New Jersey in the context of "Brooklyn–Queens Expressway"

Ad spacer

>>>PUT SHARE BUTTONS HERE<<<
In this Dossier

Linden, New Jersey in the context of Gowanus Expressway

Interstate 278 (I-278) is an auxiliary Interstate Highway in New Jersey and New York in the United States. The road runs 35.62 miles (57.32 km) from US Route 1/9 (US 1/9) in Linden, New Jersey, northeast to the Bruckner Interchange in the New York City borough of the Bronx. The majority of I-278 is in New York City, where it serves as a partial beltway and passes through all five of the city's boroughs. I-278 follows several freeways, including the Union Freeway in Union County, New Jersey; the Staten Island Expressway (SIE) across Staten Island; the Gowanus Expressway in southern Brooklyn; the Brooklyn–Queens Expressway (BQE) across Northern Brooklyn and Queens; a small part of the Grand Central Parkway in Queens; and a part of the Bruckner Expressway in the Bronx. I-278 also crosses multiple bridges, including the Goethals, Verrazzano–Narrows, Kosciuszko, and Robert F. Kennedy bridges.

I-278 was opened in pieces from the 1930s through the 1960s. Some of its completed segments predated the Interstate Highway System and are thus not up to standards, and portions of I-278 have been upgraded over the years. In New York, the various parts of I-278 were planned by Robert Moses, an urban planner in New York City. The segments proposed tore through many New York City neighborhoods, causing controversy. Despite its number, I-278 does not connect to I-78. There were once plans to extend I-278 west to I-78 east of the Route 24 interchange in Springfield, New Jersey. This was canceled because of opposition from the communities along the route. The segment that does exist in New Jersey was opened in 1969. There were also plans to extend I-78 east across Manhattan and into Brooklyn via the Williamsburg Bridge; this would have been a second interchange between I-278 and its parent highway, but these plans were also thwarted. I-78 was also planned to extend east beyond I-278 to John F. Kennedy International Airport, and then curve northward on the Clearview Expressway, ending at the Bruckner Interchange in the Bronx. If these plans were fully completed, I-78 and I-278 would have met at three interchanges.

↑ Return to Menu

Linden, New Jersey in the context of U.S. Route 1/9

U.S. Route 1/9 (US 1/9 or US 1-9) is the 31.0-mile-long (49.9 km) concurrency of US 1 and US 9 from their junction in Woodbridge in Middlesex County, New Jersey, north to New York City. The route is a multilane road with some freeway portions that runs through urbanized areas of North Jersey adjacent to New York City. Throughout most of its length in New Jersey, the road runs near the New Jersey Turnpike (Interstate 95 [I-95]). In Fort Lee, US 1/9 merges onto I-95 and crosses the Hudson River on the George Washington Bridge, where the two U.S. Routes split a short distance into New York. US 1/9 intersects several major roads, including I-278 in Linden, Route 81 in Elizabeth, I-78 and US 22 in Newark, Route 139 in Jersey City, Route 3 and Route 495 in North Bergen, and US 46 in Palisades Park. US 1/9 also serves as the primary access point to Newark Airport. Between Newark and Jersey City, US 1/9 runs along the Pulaski Skyway. Trucks are banned from this section of road and must use Truck US 1/9. The concurrency between US 1 and US 9 is commonly referred to as "1 and 9". Some signage for the concurrency, as well as the truck route, combines the two roads into one shield, separated by a hyphen (1-9) or an ampersand (1&9).

The current alignment of US 1/9 south of Elizabeth was planned as Route 1 in 1916; this road was extended to the Holland Tunnel in Jersey City in 1922. When the U.S. Highway System was created in 1926, US 1 and US 9 were marked concurrent through northern New Jersey between Rahway on the current alignments of Route 27 and Truck US 1/9. In 1927, Route 1 became Route 25, and Route 1 and Route 6 were legislated along the current US 1/9 north of Jersey City. US 1/9 originally went to the Holland Tunnel on Route 25; after the George Washington Bridge opened, the two routes were realigned to their current routing north of Jersey City. After the Pulaski Skyway opened in 1932, US 1/9 and Route 25 were routed to use this road, which soon had a truck ban resulting in the creation of Route 25T (now US 1/9 Truck). South of Newark, US 1/9 was moved from Route 27 to Route 25. In 1953, the state highways running concurrent with US 1/9 in New Jersey were removed. In 1964, the approaches to the George Washington Bridge were upgraded into I-95.

↑ Return to Menu