Gauge Change Train in the context of "Standard gauge"

Play Trivia Questions online!

or

Skip to study material about Gauge Change Train in the context of "Standard gauge"




⭐ Core Definition: Gauge Change Train

The Gauge Change Train (GCT) or Free Gauge Train (フリーゲージトレイン; "FGT") is the name given to a Japanese project started in 1994 to develop a high-speed train with variable gauge axles to allow inter-running between the 1,435 mm (4 ft 8+12 in) standard gauge Shinkansen network, and the 1,067 mm (3 ft 6 in) narrow gauge regional rail network.

Two three-car and one four-car "GCT" electric multiple unit (EMU) trains have been built for testing. The first train operated from 1998 until 2006, the second train operated from 2006 until 2014 and the third-generation train commenced testing in 2014, although testing is currently suspended due to technical issues with the bogies. The GCT was due to be introduced on the Nagasaki Shinkansen upon its opening in 2022, but JR Kyushu announced in June 2017 that it had abandoned plans to adopt the GCT for these services.

↓ Menu

In this Dossier

Gauge Change Train in the context of Shinkansen

The Shinkansen (Japanese: 新幹線; [ɕiŋkaꜜɰ̃seɴ] , lit.'new trunk line'), colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. It was initially built to connect distant Japanese regions with Tokyo, the capital, to aid economic growth and development. Beyond long-distance travel, some sections around the largest metropolitan areas are used as a commuter rail network. It is owned by the Japan Railway Construction, Transport and Technology Agency and operated by five Japan Railways Group companies.

Starting with the Tokaido Shinkansen (515.4 km; 320.3 mi) in 1964, the network has expanded to consist of 2,951.3 km (1,833.9 mi) of lines with maximum speeds of 260–320 km/h (160–200 mph), 283.5 km (176.2 mi) of Mini-shinkansen lines with a maximum speed of 130 km/h (80 mph), and 10.3 km (6.4 mi) of spur lines with Shinkansen services. The network links most major cities on the islands of Honshu and Kyushu, and connects to Hakodate on the northern island of Hokkaido. An extension to Sapporo is under construction and was initially scheduled to open by fiscal year 2030, but in December 2024, it was delayed until the end of FY2038. The maximum operating speed is 320 km/h (200 mph) (on a 387.5 km (241 mi) section of the Tōhoku Shinkansen). Test runs have reached 443 km/h (275 mph) for conventional rail in 1996, and up to a world record 603 km/h (375 mph) for SCMaglev trains in April 2015.

↑ Return to Menu