French war planning 1920–1940 in the context of "Fall Gelb"

Play Trivia Questions online!

or

Skip to study material about French war planning 1920–1940 in the context of "Fall Gelb"

Ad spacer

⭐ Core Definition: French war planning 1920–1940

The Dyle plan or Plan D was the plan of the commander-in-chief of the French Army, Général d'armée Maurice Gamelin, to defeat a German attempt to invade France through Belgium. The Dyle (Dijle) river is 86 km (53 mi) long, from Houtain-le-Val through Flemish Brabant and Antwerp; Gamelin intended French, British and Belgian troops to halt a German invasion force along the line of the river. The Franco-Belgian Accord of 1920 had co-ordinated communication and fortification efforts of both armies. After the German Remilitarization of the Rhineland on 7 March 1936, the Belgian government abrogated the accord and substituted a policy of strict neutrality, now that the German Army (Heer) was on the German–Belgian border.

French doubts about the Belgian Army led to uncertainty about whether French troops could move fast enough into Belgium to avoid an encounter battle and fight a defensive battle from prepared positions. The Escaut plan/Plan E and Dyle plan/Plan D were devised for a forward defence in Belgium, along with a possible deployment on the French–Belgian border to Dunkirk. Gamelin chose the Escaut plan, then substituted Plan D for an advance to the line of the Dyle, which was 43–50 mi (70–80 km) shorter. Some officers at Grand Quartier Général (GQG, general headquarters of the French Army) doubted that the French Army could arrive before the Germans.

↓ Menu

>>>PUT SHARE BUTTONS HERE<<<
In this Dossier

French war planning 1920–1940 in the context of Manstein plan

The Manstein plan or Case Yellow (German: Fall Gelb; also known after the war as Unternehmen Sichelschnitt a transliteration of the English Operation Sickle Cut), was the war plan of the German armed forces (Wehrmacht) for the Battle of France in 1940. The original invasion plan was an awkward compromise devised by General Franz Halder, the chief of staff of Oberkommando des Heeres (OKH, Army High Command) that satisfied no one. Documents with details of the plan fell into Belgian hands during the Mechelen incident on 10 January 1940 and the plan was revised several times, each giving more emphasis to an attack by Army Group A through the Ardennes, which progressively reduced the offensive by Army Group B through the Low Countries to a diversion.

In the final version of the plan, the main effort of the German invasion was made against the Ardennes, the weakest part of the Allied line, where the defence was left to second-rate French divisions in the Second Army and the Ninth Army, on the assumption that the difficulty of moving masses of men and equipment would give the French plenty of time to send reinforcements if the area was attacked. The Seventh Army, which had been the most powerful part of the French strategic reserve, had been committed to a rush through Belgium to join with the Dutch Army to the north, in the Breda variant of Plan D, the Allied deployment plan.

↑ Return to Menu

French war planning 1920–1940 in the context of Battle of Dunkirk

The Battle of Dunkirk (french: Bataille de Dunkerque) was fought around the French port of Dunkirk (Dunkerque) during the Second World War, between the Allies and Nazi Germany. As the Allies were losing the Battle of France on the Western Front, the Battle of Dunkirk was the defence and evacuation of British and other Allied forces to Britain from 26 May to 4 June 1940.

After the Phoney War, the Battle of France began in earnest on 10 May 1940. To the east, the German Army Group B invaded the Netherlands and advanced westward. In response, the Supreme Allied Commander, French General Maurice Gamelin, initiated "Plan D" and British and French troops entered Belgium to engage the Germans in the Netherlands. French planning for war relied on the Maginot Line fortifications along the German–French border protecting the region of Lorraine but the line did not cover the Belgian border. German forces had already crossed most of the Netherlands before the French forces had arrived. Gamelin instead committed the forces under his command – three mechanized forces, the French First and Seventh Armies and the British Expeditionary Force (BEF) – to the River Dyle. On 14 May, German Army Group A burst through the Ardennes and advanced rapidly westward toward Sedan, turning northward to the English Channel, using Generalfeldmarschall Erich von Manstein's plan Sichelschnitt (under the German strategy Fall Gelb), effectively flanking the Allied forces.

↑ Return to Menu