Central Electricity Generating Board in the context of Central Electricity Authority


Central Electricity Generating Board in the context of Central Electricity Authority

⭐ Core Definition: Central Electricity Generating Board

The Central Electricity Generating Board (CEGB) was responsible for electricity generation, transmission and bulk sales in England and Wales from 1958 until privatisation of the electricity industry in the 1990s.

It was established on 1 January 1958 to assume the functions of the Central Electricity Authority (1955–1957), which had in turn replaced the British Electricity Authority (1948–1955). The Electricity Council was also established in January 1958, as the coordinating and policy-making body for the British electricity supply industry.

↓ Menu
HINT:

In this Dossier

Central Electricity Generating Board in the context of Drax Power Station

Drax power station is a large biomass power station in Drax, North Yorkshire, England. It has a 2.6 GW capacity for biomass and had a 1.29 GW capacity for coal that was retired in 2021. Its name comes from the nearby village of Drax. It is situated on the River Ouse between Selby and Goole. Its generating capacity of 3,906 megawatts (MW), which includes the shut down coal units, is the highest of any power station in the United Kingdom, providing about 6% of the United Kingdom's electricity supply.

Opened in 1974 and extended in the 1980s, the station was initially operated by the Central Electricity Generating Board. Since privatisation in 1990 ownership has changed several times, and it is operated by the Drax Group. Completed in 1986, it was the newest coal-fired power station in England until it closed in 2021. Flue gas desulphurisation equipment was fitted between 1988 and 1995. The high and low pressure turbines were replaced between 2007 and 2012.

View the full Wikipedia page for Drax Power Station
↑ Return to Menu